News

The second phase planning of Newstep Technology was released

1 Mold Department:
 
1. Add: 2 sets of Westward slow filament,
 
2. Add 2 Rhodes and 1 MakinoF5 during processing
 
3. EDM added: 2 Makino EGDE3
 
 
 
2. Injection Molding Department:
 
1. Add 21 injection molding machines.
 
Add 100000 level dust-free workshop (10 Sumitomo 100T~180T)
 
Clean workshop increased (11 sets of Zhafir 200T~600T)

网站地图

地图