The second phase planning of Newstep Technology was released

1 Mold Department:
1. Add: 2 sets of Westward slow filament,
2. Add 2 Rhodes and 1 MakinoF5 during processing
3. EDM added: 2 Makino EGDE3
2. Injection Molding Department:
1. Add 21 injection molding machines.
Add 100000 level dust-free workshop (10 Sumitomo 100T~180T)
Clean workshop increased (11 sets of Zhafir 200T~600T)